Preparation before starting the Extra Large Generator Set

2025-03-26Font scaling:

The precautions for starting an Extra Large Generator set are as follows. We hope the following introduction can provide users with reference.

Extra Large Generator Set

1、 Preparation and inspection before starting the Extra Large Generator set
1. Appearance and structural inspection
Ensure that the appearance of the Extra Large Generator set is complete, without damage or loose parts. Check for no debris around, good ventilation, and ensure smooth heat dissipation.

2. Extra large generator set fuel system inspection
Confirm that there is sufficient fuel reserve in the fuel tank to cope with possible emergencies. Check if the fuel pipeline is unobstructed and free of leaks. Ensure that the fuel quality meets the requirements of the unit, without impurities and moisture.

3. Check the cooling system
Check if the coolant is sufficient and the liquid level should be within the normal range. Ensure that the cooling system is leak free and the cooling fan is running properly.

4. Extra large generator set lubrication system inspection
Check the oil level to ensure that the oil is at a normal level and there are no leaks. Oil quality, if necessary, replace with new oil in a timely manner.

Extra Large Generator Set
 

5. Check the electrical system
Check that the battery is fully charged and the startup system is functioning properly. The cables and wiring are not loose or damaged, and the electrical connection is good. Check that the dashboard and control panel display normally without any abnormal alarm indications.

6. Other inspections
Check that there are no flammable or explosive materials around the Extra Large Generator set to ensure safety. Check if the fasteners are loose, such as bolts, nuts, etc., and tighten them in a timely manner. Is the air filter clean? If necessary, replace it in a timely manner.

Extra Large Generator Set

二、 Precautions for Starting Extra Large Generator Set
Preheat before starting. In cold environments, the generator set should be preheated to ensure good oil flow and reduce wear during start-up.
Start the process by opening the fuel supply valve to ensure smooth flow of fuel into the engine.
Turn on the battery switch and follow the instructions in the unit manual to correctly operate the start switch to start the generator.
During the start-up process, pay close attention to the operation of the starter motor and generator set, monitor the engine sound, and check the indicator lights on the dashboard.
Start time control, the continuous working time of each start should not be too long to avoid causing excessive load on the unit. If the startup fails, wait for a period of time (such as 2 minutes or more) before attempting to start again to prevent the armature coil from overheating and burning out. If the startup fails multiple times, the reason should be identified before restarting.

By implementing the above precautions, the safe, reliable, and efficient operation of the Extra Large Generator set during startup can be ensured.
More information on Extra Large Generator Set:https://www.huaquanpower.com/

Weifang, shandong province, China 中国 山东。潍坊

     Sales hotline: +8615905360672
         WhatsApp: +8615905360672
   Email address: huaquan@huaquanpower.com
  Official website: https://www.huaquanpower.com
Production Base: No. 11666 Guting Street, Economic Development Zone,
                            Weifang City, Shandong Province
Company Name: SHANDONG HUAQUAN POWER CO.,LTD
销售热线:+8615905360672
微信客服:+8615905360672
邮箱地址:huaquan@huaquanpower.com
官方网站:https://www.huaquanpower.com
生产基地:山东省潍坊市经济开发区古亭街11666号
公司名称:山东华全动力股份有限公司

Shandong Huaquan Power Co., Ltd.

Permanent copyright